Antillean Guilder
Argentina Peso
Aruban Florin
Australian Dollar
Bahamian Dollar
Barbadian Dollar
Belize Dollar
Bermudan Dollar
Bitcoin
Brazil Real
Bulgarian Lev
Canadian Dollar
Cayman Islands Dollar
Chile Peso
China Yuan Renminbi
Columbian Peso
Costa Rican Colón
Czech Republic Koruna
Denmark Krone
Dominican Peso
Euros
Fiji Dollar
Ghanaian Cedi
Honduras Lempira
Hong Kong Dollar
Hungary Forint
Iceland Krona
India Rupee
Indonesia Rupiah
Israel Shekel
Jamaican Dollar
Japan Yen
Korea (South) Won
Lebanese Pound
Malaysia Ringgit
Mexico Peso
Mauritian Rupee
New Zealand Dollar
Nicaraguan Córdoba
Nigerian Naira
Norway Krone
Pakistan Rupee
Panamanian Balboa
Peruvian Sol
Philippine Peso
Poland Zloty
Russia Ruble
Singapore Dollar
South Africa Rand
Sweden Krona
Switzerland Franc
Taiwan New Dollar
Thailand Baht
Trinidad & Tobago Dollar
Turkey Lira
United Arab Emirates Dirham
United Kingdom Pound
Uruguayan Peso
US Dollar
Viet Nam Dong
Qatar Riyal
No of floors: 2. GFA: 1,370 sqm. Ground floor area (640 sqm): Driveway, Lockers Area, 70-sqm Pantry, 380-sqm Main Area with 127 Staff tables, 190-sqm Annex Area with 11 Staff tables and Network Operations Center. 2nd Floor Area (730 sqm): Two separate office areas with Four Executive Offices & Three Office Rooms, 10-12 Seat Conference Room, Executive Pantry, Reception Area, 249-sqm Main Area with 127 Staff Tables, 180-sqm Annex Area with 69 Staff Tables. Data Center (Network Operations Center): 22 sqm, 10 open bay rack/data cabinet space capacity with raised flooring. Building has CAT5e structured cabling; All offices and open space areas are fully carpeted; Split-type air & Mitsubishi VRF Air Conditioning Systems with total Tonnage of more than 70TR; 100% Backup Electrical Power (Genset); Geared for full GBit redundant Internet access; All office rooms are fully furnished; Area entry and exit points are fully covered with CCTV cameras. Recordings can be archived up to 90 days; Every floor has common male and female restrooms; The main executive room has its own restroom; Dedicated pantry and locker areas; The building water is supplied from Maynilad via a Cistern; Water distribution from the 800 Gallons Fabricated Steel Pressure Tank.